W. L. Hall Company Woodland Elementary (Osseo School District)

Modernfold Electric Wall Project Spotlight

w. l. hall company premier exterior and exterior systems provider in the upper midwest   modernfold woodland

The Osseo School District reached out to W. L. Hall Company to replace the electric wall for the gymnasium at Woodland Elementary School in Brooklyn Park (contracted directly with the Osseo School district). This is the second wall we have replaced for the District (the first being for Edenbrook Elementary last year).

w l hall company modernfold woodland elementary 2

The electric wall system we installed is a Modernfold 933 E (Electric) wall. This wall has the lower half of the wall as a Wilsonart Laminate finish, with the upper half being Modernfold standard vinyl.


We demo the existing walls, track, and soffit for these projects. We layout our system to mesh in with the existing structure and install our new track, and panels, and in this case, modify the existing soffit to work with our system.

w l hall company modernfold woodland elementary 2

The projects W. L. Hall Company completes for the school district are “Turn-Key” projects, meaning the school does not have to provide anything other than access to the space. We provided the demolition, dumpsters, lifts, and a new electrically operated wall.

The Modernfold 933 E (Electric) wall project was completed on time and on budget. Woodland Elementary's gymnasium wall can now be converted in a matter of minutes to control acoustics and to use their limited space as efficiently as possible.

w l hall company modernfold woodland elementary

Let Us Turn Your Design into Reality!

w l hall company modernfold
By Ira Hackner August 20, 2026
Privacy When Needed, Flexibility on Demand for EntreBank
By Ira Hackner August 13, 2026
From Barrio to Bright & Bold — Americana Is Taking Shape at 50th & France
By Ira Hackner August 5, 2026
Designing for the Future: U of MN Weisman Art Museum Window Replacement
By Ira Hackner July 16, 2026
Lifestyle Changes Drive Design Changes
By Ira Hackner July 10, 2026
When Life Safety and Design Work Together
By Ira Hackner June 18, 2026
Design-Assist That Solves Challenges for Edenvale Baptist Church
By Ira Hackner May 21, 2026
Enhancing Performance & Appearance at the Wayzata Public Schools Central Services Facility
By Ira Hackner May 14, 2026
From Design Intent to Drill-Sergeant Precision | MN Veterans & Military Museum
By Ira Hackner May 7, 2026
Skyfold Performance & Flexibility Without the “Can Everyone Help Move This?”
By Ira Hackner April 23, 2026
In collaboration with Alliiance Architects (Minneapolis) and Sheehy Construction (St. Paul), our team helped bring their meeting room renovation design at the Minneapolis Convention Center to life—delivering Modernfold Acousti-Seal Encore® operable wall systems (STC 54) designed for flexibility, performance, and long-term durability. When most design professionals start thinking about using an operable wall system, they usually focus on the panel. That makes sense as panel type, STC levels, and finishes are important. What about the track? After all, unless the system is motorized, those panels aren't going to move themselves! Some of the panels on this project weigh almost 800 lbs.! By using radius curved track, Modernfold was able to design a wall and track system that will provide easy operation for years to come.