Blog Layout

W. L. Hall Company Woodland Elementary (Osseo School District)

Modernfold Electric Wall Project Spotlight

The Osseo School District reached out to W. L. Hall Company to replace the electric wall for the gymnasium at Woodland Elementary School in Brooklyn Park (contracted directly with the Osseo School district). This is the second wall we have replaced for the District (the first being for Edenbrook Elementary last year).

w l hall company modernfold woodland elementary 2

The electric wall system we installed is a Modernfold 933 E (Electric) wall. This wall has the lower half of the wall as a Wilsonart Laminate finish, with the upper half being Modernfold standard vinyl.


We demo the existing walls, track, and soffit for these projects. We layout our system to mesh in with the existing structure and install our new track, and panels, and in this case, modify the existing soffit to work with our system.

w l hall company modernfold woodland elementary 2

The projects W. L. Hall Company completes for the school district are “Turn-Key” projects, meaning the school does not have to provide anything other than access to the space. We provided the demolition, dumpsters, lifts, and a new electrically operated wall.

The Modernfold 933 E (Electric) wall project was completed on time and on budget. Woodland Elementary's gymnasium wall can now be converted in a matter of minutes to control acoustics and to use their limited space as efficiently as possible.

w l hall company modernfold woodland elementary

Let Us Turn Your Design into Reality!

w l hall company modernfold
By Ira Hackner 02 May, 2024
Lakewood Cemetery (Minneapolis) New Eco-Friendly Visitor Center Glass & Glazing Project
By Ira Hackner 18 Apr, 2024
Skyfold Mirage for Magnifi Financial's Maple Grove New Branch Office
By Ira Hackner 10 Apr, 2024
Orthopaedic Hospital of Wisconsin (OHOW) Center at UW-Milwaukee Kalwall Translucent Panel System
By Ira Hackner 02 Apr, 2024
W. L. Hall Company | Window Renovation Project Spotlights
By Ira Hackner 21 Mar, 2024
Tartan High School (Oakdale, MN) | Effortless space reconfiguration for the school's four multipurpose rooms
W. L. Hall Company 2024 MOD Rate is at our all-time low of 0.60
By Ira Hackner 18 Mar, 2024
W. L. Hall Company 2024 MOD Rate is at our all-time low of 0.60
By Ira Hackner 12 Mar, 2024
Hazelden Betty Ford Foundation Facility (Center City, MN) New Wood Curtainwall System Project
By Ira Hackner 05 Mar, 2024
Women in Construction Week Spotlight - March 3 - 9, 2024 Heather Isaacson | Head of Engineering ๏ปฟ W. L. Hall Company
By Ira Hackner 29 Feb, 2024
Abbott Northwestern Hospital (Minneapolis) Central Utility Plant (CUP) - | Glass & Glazing (EFCO) | Security & Climate Control (McKeon)
By Ira Hackner 22 Feb, 2024
4Marq Apartments (Minneapolis) | High-Performance and Cost-Effective Window Systems that Produce Amazing Views
More Posts
Share by: