Owatonna (MN) High School’s Spectacular New Auditorium

w l hall company marlite owatonna auditorium

Wold Architects and Kraus-Anderson Construction set out to design and construct an auditorium space in the new Owatonna High School that would be the envy of any school in the country. 

w l hall company marlite owatonna auditorium 2

To help make the lobby area and theater interior “pop”, Wold detailed and specified Marlite’s Transforming Architectural Wall System in Quartered Block Mottled Makore veneer.

w l hall company marlite owatonna auditorium

To add additional interest to the theater application, Wold detailed light rails with RGBW LED light strips so the reveals in with wall panels can actually change color on demand. Wold chose the Transforming Architectural Wall System due to its versatility, durability and overall beautiful aesthetic.

w l hall company marlite owatonna auditorium 5

Many construction professionals don’t realize the significant advantages of a custom designed, pre-engineered manufactured panel system such as Marlite. 


Those advantages include:

 

  • Dynamic look with dynamic design flexibility
  • A wide variety of finishes (wood veneer, HPL , custom printed graphics, 3Form, etc)
  • A wide variety of trims and reveals (finishes include: black, painted or anodized aluminum)
  • Dimensional panel options to create visual interest
  • Quickly remove or replace any panel individually. No muss, no fuss or damage to surrounding panels
  • Single source responsibility, no cobbling together and installation of components from multiple suppliers
  • Factory cut panels are available to significantly decrease installation time
  • Great product consistency (a manufactured product vs. one off, custom applications)
w l hall company marlite owatonna auditorium 7

Wold designed a unique, one-of-a-kind space using Marlite. How can Marlite and the W. L. Hall Company help you do the same on your next project?


Click on the image below to discover our wide-ranging portfolio of collaborative projects.

w l hall company portfolio
w l hall company
By Ira Hackner August 27, 2026
Ready for the Fair: Renewing a Minnesota Landmark
By Ira Hackner August 20, 2026
Privacy When Needed, Flexibility on Demand for EntreBank
By Ira Hackner August 13, 2026
From Barrio to Bright & Bold — Americana Is Taking Shape at 50th & France
By Ira Hackner August 5, 2026
Designing for the Future: U of MN Weisman Art Museum Window Replacement
By Ira Hackner July 16, 2026
Lifestyle Changes Drive Design Changes
By Ira Hackner July 10, 2026
When Life Safety and Design Work Together
By Ira Hackner June 18, 2026
Design-Assist That Solves Challenges for Edenvale Baptist Church
By Ira Hackner May 21, 2026
Enhancing Performance & Appearance at the Wayzata Public Schools Central Services Facility
By Ira Hackner May 14, 2026
From Design Intent to Drill-Sergeant Precision | MN Veterans & Military Museum
By Ira Hackner May 7, 2026
Skyfold Performance & Flexibility Without the “Can Everyone Help Move This?”