The VA Hospital Building 70 in South Minneapolis required upgrading its existing window system, originally constructed in 1986. The windows were overdue for an update to meet contemporary performance standards.

Veterans Administration Building (Minneapolis) Window Replacement Project w l hall company the premier interior & exterior building systems provider in the upper midwest 2

In collaboration with our esteemed partners, Leo A Daly Architects (Minneapolis) and Greenstone Construction (Fargo, ND), W. L. Hall Company developed a solution that retained the existing master frame while replacing the windows.

Veterans Administration Building (Minneapolis) Window Replacement Project w l hall company the premier interior & exterior building systems provider in the upper midwest 3

The initial Alpana system, allowing windows to open 90 degrees, permitted cold air infiltration around the perimeter between the master frame and Alpana windows.


 In certain hospital areas, windows had to be duct-taped to mitigate the cold air ingress. W. L. Hall Company introduced the Wausau 3250i (3 ¼ depth) InVent window series, centered in the 4” master frame as fixed windows and due to the representation of the VA Hospital by the US Army Corps of Engineers (USACE),

 W. L. Hall Company and Leo A. Daly had to demonstrate compliance with USACE's design requirements.

Veterans Administration Building (Minneapolis) Window Replacement Project w l hall company the premier interior & exterior building systems provider in the upper midwest 6

Following the acceptance of the design, we were able to proceed with ordering and installing new sashes. Given the comprehensive nature of the project, the VA structured the sash replacements into phases. 


 The design process for Phase I commenced in 2019, with installation in the summer of 2020 amid the pandemic. Subsequent phases were carried out in the summer of 2021 and the winter of 2022.

Veterans Administration Building (Minneapolis) Window Replacement Project w l hall company the premier interior & exterior building systems provider in the upper midwest 11

Our guys in action - getting the job done!

Veterans Administration Building (Minneapolis) Window Replacement Project w l hall company the premier interior & exterior building systems provider in the upper midwest 8

To date, we have successfully replaced 1,324 window sashes, and an additional 76 sashes and spandrel glass replacements are planned for this summer. Further replacements are in the pipeline pending budget approval.


Reach out to us to make your next window installation & replacement project into reality!

w l hall company portfolio The Premier Exterior and Interior Building Systems Provider in the Upper Midwest
The Premier Exterior and Interior Building Systems Provider in the Upper Midwest 12
By Ira Hackner June 6, 2025
Essentia Health St. Mary’s Medical Center's (Duluth) new high-performance façade system at the Level 6 - Inpatient Entrance.
By Ira Hackner June 6, 2025
A Brighter Future for West Minnehaha Recreation Center
By Ira Hackner May 19, 2025
In collaboration with BWBR Architects (St. Paul) and Knutson Construction (Minneapolis), our team brought their design vision to reality for the comprehensive glass and glazing renovation at the University of Minnesota's Shepherd Laboratory. This project was strategically designed to: Transform the research and instructional environments spanning floors 3-5 Enhance thermal performance via contemporary glazing solutions and advanced curtain wall technology Foster a dynamic atmosphere conducive to collaboration and adaptable work arrangements Elevate the visual character and architectural presence of the building Embrace environmentally responsible design practices, including specialized bird-friendly glass treatments
By Ira Hackner May 8, 2025
Marlite Artizan Max Defense FRP Panels | Taking Durability and Design to a Higher Level
By Ira Hackner April 25, 2025
Due to our "challenging" winter weather conditions, building maintenance professionals frequently schedule glass atrium and curtainwall repair initiatives when spring arrives. Among our current projects in this category are the 1550 Utica Avenue Tower (St. Louis Park), Glass Atrium Roof rehabilitation, and the restoration of curtainwall components at Reflections Condominiums (Bloomington).
By Ira Hackner April 9, 2025
Crowe Construction (St. Louis Park) contacted us about replacing the skylights at Artistry on 10th, a modern luxury apartment complex. The existing skylights were extremely leaky, aesthetically unappealing, had poor opacity, and failed to meet current-day structural requirements. They allowed minimal natural light to enter the space, provided little comfort or functionality, and were energy inefficient.
By Ira Hackner March 28, 2025
Through a strategic collaboration with ESG Architecture (Minneapolis) and Kraus-Anderson Construction (Minneapolis), we provided the exterior glazing on The Larking—a landmark 16-story development redefining urban residential spaces in Minneapolis.
By Ira Hackner March 19, 2025
The owner of Vadnais Heights Commons reached out to us to address issues with their existing glass skylights, which were failing structurally, causing excessive heat buildup, and experiencing persistent leaks.
By Ira Hackner March 7, 2025
OK, we admit it's not exactly an Oscar. When Accenture needed a smartly designed space that allowed natural light to flow through while ensuring the right level of visual and acoustic privacy they turned to Modernfold.
By Ira Hackner February 26, 2025
We're excited to share the results of two, recent commercial skylight projects in the Minneapolis-St. Paul metro area. Our innovative skylight systems help enhance natural light, boost energy efficiency, and create brighter, more comfortable spaces for occupants.
More Posts