The VA Hospital Building 70 in South Minneapolis required upgrading its existing window system, originally constructed in 1986. The windows were overdue for an update to meet contemporary performance standards.

Veterans Administration Building (Minneapolis) Window Replacement Project w l hall company the premier interior & exterior building systems provider in the upper midwest 2

In collaboration with our esteemed partners, Leo A Daly Architects (Minneapolis) and Greenstone Construction (Fargo, ND), W. L. Hall Company developed a solution that retained the existing master frame while replacing the windows.

Veterans Administration Building (Minneapolis) Window Replacement Project w l hall company the premier interior & exterior building systems provider in the upper midwest 3

The initial Alpana system, allowing windows to open 90 degrees, permitted cold air infiltration around the perimeter between the master frame and Alpana windows.


 In certain hospital areas, windows had to be duct-taped to mitigate the cold air ingress. W. L. Hall Company introduced the Wausau 3250i (3 ¼ depth) InVent window series, centered in the 4” master frame as fixed windows and due to the representation of the VA Hospital by the US Army Corps of Engineers (USACE),

 W. L. Hall Company and Leo A. Daly had to demonstrate compliance with USACE's design requirements.

Veterans Administration Building (Minneapolis) Window Replacement Project w l hall company the premier interior & exterior building systems provider in the upper midwest 6

Following the acceptance of the design, we were able to proceed with ordering and installing new sashes. Given the comprehensive nature of the project, the VA structured the sash replacements into phases. 


 The design process for Phase I commenced in 2019, with installation in the summer of 2020 amid the pandemic. Subsequent phases were carried out in the summer of 2021 and the winter of 2022.

Veterans Administration Building (Minneapolis) Window Replacement Project w l hall company the premier interior & exterior building systems provider in the upper midwest 11

Our guys in action - getting the job done!

Veterans Administration Building (Minneapolis) Window Replacement Project w l hall company the premier interior & exterior building systems provider in the upper midwest 8

To date, we have successfully replaced 1,324 window sashes, and an additional 76 sashes and spandrel glass replacements are planned for this summer. Further replacements are in the pipeline pending budget approval.


Reach out to us to make your next window installation & replacement project into reality!

w l hall company portfolio The Premier Exterior and Interior Building Systems Provider in the Upper Midwest
The Premier Exterior and Interior Building Systems Provider in the Upper Midwest 12
By Ira Hackner 18 Apr, 2024
Skyfold Mirage for Magnifi Financial's Maple Grove New Branch Office
By Ira Hackner 10 Apr, 2024
Orthopaedic Hospital of Wisconsin (OHOW) Center at UW-Milwaukee Kalwall Translucent Panel System
By Ira Hackner 02 Apr, 2024
W. L. Hall Company | Window Renovation Project Spotlights
By Ira Hackner 21 Mar, 2024
Tartan High School (Oakdale, MN) | Effortless space reconfiguration for the school's four multipurpose rooms
W. L. Hall Company 2024 MOD Rate is at our all-time low of 0.60
By Ira Hackner 18 Mar, 2024
W. L. Hall Company 2024 MOD Rate is at our all-time low of 0.60
By Ira Hackner 12 Mar, 2024
Hazelden Betty Ford Foundation Facility (Center City, MN) New Wood Curtainwall System Project
By Ira Hackner 05 Mar, 2024
Women in Construction Week Spotlight - March 3 - 9, 2024 Heather Isaacson | Head of Engineering ๏ปฟ W. L. Hall Company
By Ira Hackner 29 Feb, 2024
Abbott Northwestern Hospital (Minneapolis) Central Utility Plant (CUP) - | Glass & Glazing (EFCO) | Security & Climate Control (McKeon)
By Ira Hackner 22 Feb, 2024
4Marq Apartments (Minneapolis) | High-Performance and Cost-Effective Window Systems that Produce Amazing Views
By Ira Hackner 15 Feb, 2024
Hopkins Senior High & West Junior High Schools Utilize ZONA & Modernfold Glass Walls for Collaborative, Safe and Flexible Learning Environments
More Posts
Share by: