Minneapolis Eastside Maintenance Facility Kalwall Daylighting Project

Minneapolis Eastside Maintenance Facility Kalwall Daylighting Project w l hall company

In the early stages of planning for the New Eastside Maintenance Facility, the City of Minneapolis engaged HCM Architects and Adolphson & Peterson Construction for their design and construction expertise for the project.๏ปฟ

Minneapolis Eastside Maintenance Facility Kalwall Daylighting Project w l hall company 3

HCM Architects has a long history of collaboration with W. L. Hall Company to incorporate natural daylight into their projects. As part of our collaborative efforts, we presented numerous budgets and conducted multiple daylight modeling studies.


These analyses helped the HCM team select the most efficient systems, configurations, and apertures for this significant Kalwall installation.

After careful consideration, the final choice for the New Eastside Maintenance Facility was to utilize Kalwall's Ice Blue exterior face sheets, both in the wall panels and as sunshades.   Kalwall's innovative daylighting technology offers the perfect balance between illuminating the interior spaces with natural light while maintaining optimal energy efficiency.

By using Kalwall's advanced daylighting solutions, the City of Minneapolis demonstrates its commitment to sustainability and environmentally friendly construction practices. The strategic use of natural light reduces the need for artificial lighting during daytime hours and lessens the building's overall carbon footprint, aligning with the city's broader eco-conscious initiatives.

By using Kalwall's advanced daylighting solutions, the City of Minneapolis demonstrates its commitment to sustainability and environmentally friendly construction practices. The strategic use of natural light reduces the need for artificial lighting during daytime hours and lessens the building's overall carbon footprint, aligning with the city's broader eco-conscious initiatives.
By Ira Hackner November 21, 2025
Most building professionals know that air leakage is one of the biggest performance failures in commercial buildings. What is less understood is this: Air leakage doesn't move in only one direction. It can move inward (infiltration) or outward (exfiltration) — and each direction carries its own set of energy, comfort, and moisture-control consequences. Even worse, rolling doors have historically been among the weakest points of the building envelope.
By Ira Hackner November 14, 2025
Daylighting, Durability & Performance: Why the Thief River Falls Regional Airport Chose Kalwall
By Ira Hackner November 7, 2025
We truly enjoyed working with HCM Architects (Minneapolis), TKDA Architects (Bloomington), Knutson Construction (Minneapolis), and McGough (St. Paul), who brought four new Xcel Energy service facilities — in Chanhassen, Onalaska (WI), St. Cloud, and St. Paul–Maplewood. We helped bring their design visions to life with Kalwall’s advanced translucent daylighting systems, which elevate energy efficiency, occupant comfort, and thermal performance.
By Ira Hackner October 30, 2025
AIA Minnesota Excellence in Design for Energy Award Lakewood Cemetery's Welcome Center
By Ira Hackner October 20, 2025
2025 Rethos Historic Rehabilitation Award Winner | Landmark Tower Apartments (St. Paul) Conversion
By Ira Hackner October 6, 2025
We were pleased to collaborate with Mohagen Hansen Architecture (Wayzata, MN) and Gardner Builders (Minneapolis) to bring their design vision for Agralite Electric Cooperative’s new 63,000-square-foot headquarters in Benson, MN, to life—featuring the innovative use of Kalwall® daylighting systems in both the office space and the warehouse.
By Ira Hackner September 19, 2025
Carleton College (Northfield, MN) is recognized for its rigorous academics, intimate class sizes averaging just 14 students, and a strong sense of community. We were proud to bring our extensive expertise in educational glass and glazing projects to the college’s Class of 1974 Building, made possible through the generosity of the Class of 1974 alumni.
By Ira Hackner September 12, 2025
Boston Scientific's Maple Grove Expansion – Supported by W. L. Hall Company Solutions
By Ira Hackner September 2, 2025
When Hornig Companies set out to build their new headquarters in St. Louis Park, Tanek Architects (Minneapolis) and Gardner Builders (Minneapolis) designed a conference room that could do it all—flexibility, acoustics, and aesthetics.
By Ira Hackner August 21, 2025
Think of the McKEON AirShield™ AL3014 as more than just a door—it’s a precision-engineered barrier designed to keep comfort in and unwanted air out. This high-performance overhead coiling system is built for environments where air matters most: from busy industrial facilities to sensitive institutional spaces. ๆ‰‡๐ŸŒฌ๏ธ Superior Air Control – Keeps interior climates stable by minimizing air infiltration and exfiltration ๐Ÿ’ก Energy Efficiency – Helps cut heating and cooling costs while meeting today’s strict energy standards ๐Ÿ›  Durability You Can Trust – Engineered to perform reliably in the toughest conditions The result? Protected interiors, better comfort, and a door system that works as hard as you do.