Blog Layout

McKEON Fire Door & Curtain Protection for the New Carbon 31 Luxury Apartments (Bloomington, MN)

w l hall company mckeon door for carbon 31 luxury apartments 1

Carbon 31 is a new active lifestyle apartment community in Bloomington's South Loop District, where upscale meets nature, offering luxury and sophistication.

w l hall company mckeon door for carbon 31 luxury apartments 3

Carbon 31 had specific needs regarding fire safety and security. It was important for building occupants to be able to see inside an area before they entered. If that opening was part of a fire wall, the door would have to be either solid or have only a limited amount of glass. By using McKeon fire rated products directly adjacent to these openings, our esteemed partners, ESG Architecture and Design and McGough Construction could use full glass doors providing maximum visibility.


Where overhead space was not a problem, a McKeon coiling fire shutter was used. Where headspace was limited, a McKeon D200 fire rated curtain was used. Lastly, were a limited amount of egress was required, a McKeon D200E was used to allow a limited number of occupants to egress out of the space. All McKeon D200 systems have a UL 10D rating for up to 3 hours and a UL 1784 rating for smoke and draft resistance.

w l hall company mckeon door for carbon 31 luxury apartments 2

The next time you are trying to balance the requirements for fire protection, smoke containment, security, and access control on a project, call W. L. Hall Company to find out how are wide variety of code compliant products can help.


Click on the image below (W. L. Hall Company eFlipBook) to discover our wide-ranging portfolio of collaborative projects.

Click on the image below (W. L. Hall Company eFlipBook) to discover our wide-ranging portfolio of collaborative projects.
By Ira Hackner 15 May, 2024
Minnesota State Office Building Exterior Glazing Project
By Ira Hackner 09 May, 2024
Spotlight on the North Loop Green Project: Transforming the Minneapolis Skyline
By Ira Hackner 02 May, 2024
Lakewood Cemetery (Minneapolis) New Eco-Friendly Visitor Center Glass & Glazing Project
By Ira Hackner 18 Apr, 2024
Skyfold Mirage for Magnifi Financial's Maple Grove New Branch Office
By Ira Hackner 10 Apr, 2024
Orthopaedic Hospital of Wisconsin (OHOW) Center at UW-Milwaukee Kalwall Translucent Panel System
By Ira Hackner 02 Apr, 2024
W. L. Hall Company | Window Renovation Project Spotlights
By Ira Hackner 21 Mar, 2024
Tartan High School (Oakdale, MN) | Effortless space reconfiguration for the school's four multipurpose rooms
W. L. Hall Company 2024 MOD Rate is at our all-time low of 0.60
By Ira Hackner 18 Mar, 2024
W. L. Hall Company 2024 MOD Rate is at our all-time low of 0.60
By Ira Hackner 12 Mar, 2024
Hazelden Betty Ford Foundation Facility (Center City, MN) New Wood Curtainwall System Project
By Ira Hackner 05 Mar, 2024
Women in Construction Week Spotlight - March 3 - 9, 2024 Heather Isaacson | Head of Engineering ๏ปฟ W. L. Hall Company
More Posts
Share by: