Blog Layout

W. L Hall Company teams with Syntégra Door to deliver fully integrated fire door systems. 

W. L. Hall Company Syntegra Door Fire Door

W. L Hall Company teams with Syntégra Door to deliver fully integrated fire door systems. 


All working hardware is pre-assembled into a fully functional unit, field adjustable, and ready to hang. 

 

  • The patented, open-edge construction conceals hardware within the steel door to improve aesthetics and performance and reduce tampering and vandalism.
  • Integrated, adjustable, full-length leading-edge fine-tune with just a screwdriver to fit door openings and meet demanding door-gap building codes.
  • The edge seal conceals adjustment screws, attenuates noise, and prevents smoke infiltration in case of fire.

 

                                                Combine Sleek Beauty & Functionality!  

W. L. Hall Company Syntegra Door Fire Door
W. L. Hall Company Syntegra Door Fire Door

W. L. Hall Company & Syntégra Door Assures:


  • A perfect fit for assembly areas, elevator cabs, elevator lobbies, cross corridors, smoke barriers, stairwells, and other installations
  • No bulky lever escutcheons, roses, exit device housings, faceplates, protruding top strikes 
  • Mechanical and electrical options to match your functional requirements
  • Less time and on-site coordination are required with pre-installed, pre-adjusted hardware
  • Simple installation – typically hang the door and attach door closer
  • Complete compatibility – designed, tested, and certified as a system


                                  Minimize the Clutter. Maximize the Beauty.

W. L. Hall Company Syntegra Door Fire Door
W. L. Hall Company Syntegra Door Fire Door

  The perfect fit for virtually any application – while being easy to install!


Contact Us for a FREE Consultation


W. L. Hall Company

The Premier Exterior & Interior Building Systems Provider in the Upper Midwest

(952) 937-8400

wlhall.com

sales@wlhall.com

W. L. Hall Company Syntegra Door Fire Door
W. L. Hall Company Syntegra Door Fire Door
By Ira Hackner 02 May, 2024
Lakewood Cemetery (Minneapolis) New Eco-Friendly Visitor Center Glass & Glazing Project
By Ira Hackner 18 Apr, 2024
Skyfold Mirage for Magnifi Financial's Maple Grove New Branch Office
By Ira Hackner 10 Apr, 2024
Orthopaedic Hospital of Wisconsin (OHOW) Center at UW-Milwaukee Kalwall Translucent Panel System
By Ira Hackner 02 Apr, 2024
W. L. Hall Company | Window Renovation Project Spotlights
By Ira Hackner 21 Mar, 2024
Tartan High School (Oakdale, MN) | Effortless space reconfiguration for the school's four multipurpose rooms
W. L. Hall Company 2024 MOD Rate is at our all-time low of 0.60
By Ira Hackner 18 Mar, 2024
W. L. Hall Company 2024 MOD Rate is at our all-time low of 0.60
By Ira Hackner 12 Mar, 2024
Hazelden Betty Ford Foundation Facility (Center City, MN) New Wood Curtainwall System Project
By Ira Hackner 05 Mar, 2024
Women in Construction Week Spotlight - March 3 - 9, 2024 Heather Isaacson | Head of Engineering  W. L. Hall Company
By Ira Hackner 29 Feb, 2024
Abbott Northwestern Hospital (Minneapolis) Central Utility Plant (CUP) - | Glass & Glazing (EFCO) | Security & Climate Control (McKeon)
By Ira Hackner 22 Feb, 2024
4Marq Apartments (Minneapolis) | High-Performance and Cost-Effective Window Systems that Produce Amazing Views
More Posts
Share by: